Most of the flooring is down, even inside the workshop, and the kitchen was delivered today.
The wall behind the stud was insulated and the plaster boarding started, and the expanse of the flooring, right up to the tea bar.
Most of the flooring is down, even inside the workshop, and the kitchen was delivered today.
The wall behind the stud was insulated and the plaster boarding started, and the expanse of the flooring, right up to the tea bar.